Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Beg, M A (1999) An economic based decision support system for project level pavement type selection, Unpublished PhD Thesis, , The University of Texas at Austin.

Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application, Unpublished PhD Thesis, , The University of Texas at Austin.

Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy, Unpublished PhD Thesis, , The University of Texas at Austin.

Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index, Unpublished PhD Thesis, , The University of Texas at Austin.

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations, Unpublished PhD Thesis, , The University of Texas at Austin.

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration, Unpublished PhD Thesis, , The University of Texas at Austin.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Gebken, R J, II (2006) Quantification of transactional dispute resolution costs for the United States construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Glover, R W (1972) Developing and upgrading minority construction contractors: The Houston and Atlanta experiences, Unpublished PhD Thesis, , The University of Texas at Austin.

Goodrum, P M (2001) The impact of equipment technology on productivity in the United States construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Griffith, A F (1997) Team alignment during pre-project planning of capital facilities, Unpublished PhD Thesis, , The University of Texas at Austin.

Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Jung, Y (1997) Information systems planning methodology for the construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level, Unpublished PhD Thesis, , The University of Texas at Austin.

  • Type: Thesis
  • Keywords: reliability; philosophy; construction project; best practice; owner; project performance; research institute
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305515477
  • Abstract:
    The construction industry has become increasingly more competitive and organizations need to continuously improve in order to remain successful. One way of improving organizations is implementing knowledge or existing research products typically developed by various universities and research institutes such as the Construction Industry Institute (CII). Although there are valuable research products available which have tremendous potential to improve construction project performance as well as the organization's business processes, many of them have not been implemented to a significant extent on real world projects (CII, 1995). Despite the importance of the implementation effort, there is little research focused on the implementation of existing research products or methods of measuring the degree of the implementation effort. The traditional philosophy of construction management places great emphasis on the ability to plan and execute individual projects (Chinowsky, 2000). In contrast, a similar emphasis on the overall ability of an organization is many times lacking in the construction industry. This dissertation focuses on assessing a construction organization's implementation effort at organizational level using construction-related knowledge that CII has developed. A survey questionnaire was developed based on the information gathered from literature and inputs from industry participants to evaluate organizational implementation status. The survey was validated through two pilot tests and the finalized questionnaire was distributed to 88 CII member organizations including both owner and contractor companies. The data collected from surveys were analyzed by using independent-samples t tests, ANOVA, and reliability tests. Based on the survey data, the CII Knowledge Implementation Index (CKII) was developed to quantify the level of organizational implementation status. Evaluation of the CKII against other implementation indicators, such as project use indices, verified that the CKII is consistent with other related measures. The level of the CII Best Practice implementation was also evaluated in terms of the frequency and intensity. A significant and positive relationship was found between the CKII and project performance as measured in various performance variables. Research procedures, conclusions, and recommendations for industry and for future research are also discussed in this dissertation.

Laufer, A (1980) Assessment of financial incentive programs for the construction labor force: A Delphi analysis, Unpublished PhD Thesis, , The University of Texas at Austin.

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies, Unpublished PhD Thesis, , The University of Texas at Austin.

McNerney, M T (1994) The use of geographical information systems for airport engineering and management, Unpublished PhD Thesis, , The University of Texas at Austin.

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships, Unpublished PhD Thesis, , The University of Texas at Austin.

Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques, Unpublished PhD Thesis, , The University of Texas at Austin.

Seo, J (1998) Graphical interface design for equipment control in unstructured environments, Unpublished PhD Thesis, , The University of Texas at Austin.

Shaw, D T (1989) SITE CODE: A knowledge-based model of municipal site development regulations for computer-aided design, Unpublished PhD Thesis, , The University of Texas at Austin.

Song, J (2005) Tracking the location of materials on construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation, Unpublished PhD Thesis, , The University of Texas at Austin.

Toews, C D (1981) The regional economic and labor market impact of large-scale, rural, public works construction: A case study of the McClellan-Kerr Arkansas River Navigation System, Unpublished PhD Thesis, , The University of Texas at Austin.

Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements, Unpublished PhD Thesis, , The University of Texas at Austin.

Wilson, M C (2000) Public infrastructure investment and structural economic change: The spatial dynamics of public works in the United States, Unpublished PhD Thesis, , The University of Texas at Austin.

Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration, Unpublished PhD Thesis, , The University of Texas at Austin.

Zhang, Z (1996) A gis-based and multimedia integrated infrastructure management system, Unpublished PhD Thesis, , The University of Texas at Austin.